The project zone is within the dune field at or near the WORA and Lands End subdivision.  Contractors will develop a stormwater infiltration system to manage runoff in the Lands End and Pebble Beach subdivisions.

For further information, provided is an article produced and published by NCSU.  https://stormwater.wef.org/2013/04/north-carolina-state-university-publishes-study-on-dune-infiltration-systems/


Timeline

Project Start Date: Q2 2024

Projected End Date: Q4 2024

Status:  Engineering/Architect Preliminary Plan Consultation 

Next Step: Engineering/Architect Plan Drawings and Cost Estimates 