Stormwater RFQ, Q&A

Please see below for Q&A pertaining to the Stormwater RFQ. 

  • Does the Town have a preferred platform?

*Regarding the final product for public consumption, the Town of EI does not have a preferred software or platform. Any compiled materials should use current BMPs.

  • Is the project funded?

*The compilation of a comprehensive stormwater study is a top priority for the Town of Emerald Isle.

*Pricing will impact the ability of the Town to engage a partial or full study.

*Funds have been earmarked for this project.

  • What is the anticipated start date?

*The Town intends to select a firm during the month of October 2020.

*If negotiations are completed, the Town intends to award a contract in November 2020.

*Work would be expected to begin immediately with deliverables in hand no later than July 2021.

  • The RFQ lists “20 pages front and back limit.” Does this mean a total of 40 single-sided pages?

*40 single-sided pages are acceptable.

  • What is the Town’s file size limitation for email attachments?

*The Town’s IT system is limited to 35 MB.

*If an electronic file is shared, it is the sole responsibility of the sender to verify receipt before the deadline. 


REQUEST FOR QUALIFICATIONS (RFQ) ANNOUNCED PURSUANT TO N.C. GEN. STAT.§ 143-64.31

EMERALD ISLE, NC- RFQ for Stormwater infrastructure planning, design and permitting (Due Oct 7, 2020 @ 2:00 PM)   Edit

The Town of Emerald Isle is requesting that licensed engineering firms submit qualifications with expertise in stormwater infrastructure planning, design and permitting.

Interested firms should submit proposals no later than 2:00 pm on WEDNESDAY, OCTOBER 7, 2020 to:

CLICK HERE FOR THE FULL PROPOSAL 

Proposals shall be Mailed or Hand Delivered to:

Storm Water RFQ

Attn: Matt Zapp, Town Manager

7500 Emerald Drive

Emerald Isle, NC  28594

Or emailed to:

mzapp@emeraldisle-nc.org

 

Posted by Sarah Williams Tuesday, September 29, 2020 10:34:00 AM Categories: News